Insights/Directory/P-80 (Búzios 9)
FPSO profile · Santos Basin
FPSO P-80 (Búzios 9)
FPSO P-80 is an EPC-built unit (contractor: Seatrium) on the Búzios field, operated by Petrobras with a nameplate capacity of 225,000 barrels of oil per day. It is targeting first oil in 2027 and is under construction.
- Status
- Under construction
- Field
- Búzios
- Basin
- Santos
- Field operator
- Petrobras
- Contract model
- EPC
- Contractor / owner
- Seatrium
- Oil capacity
- 225,000 bpd
- First oil
- 2027 (target)
Supplier on this unit?Equipment and service suppliers with a track record on FPSO P-80 can be featured here.
Become a Founding Partner.
Other units at Búzios
| FPSO | Field | Field operator | Contract | Contractor / owner | Oil (bpd) | First oil | Status |
|---|---|---|---|---|---|---|---|
| P-74 | Búzios | Petrobras | Owned (Petrobras) | Petrobras | 150,000 | Apr 2018 | Producing |
| P-75 | Búzios | Petrobras | Owned (Petrobras) | Petrobras | 150,000 | Nov 2018 | Producing |
| P-76 | Búzios | Petrobras | Owned (Petrobras) | Petrobras | — | Feb 2019 | Producing |
| P-77 | Búzios | Petrobras | Owned (Petrobras) | Petrobras | 150,000 | 2019 | Producing |
| Almirante Barroso (MV32) | Búzios | Petrobras | Charter | MODEC | 150,000 | May 2023 | Producing |
| Almirante Tamandaré | Búzios | Petrobras | Charter | SBM Offshore | 225,000 | Feb 2025 | Producing |
| P-78 (Búzios 6) | Búzios | Petrobras | EPC | Seatrium | 180,000 | Dec 2025 | Producing |
| P-79 (Búzios 8) | Búzios | Petrobras | EPC | Saipem + Hanwha Ocean | 180,000 | May 2026 | Producing |
| P-82 (Búzios 10) | Búzios | Petrobras | EPC | Seatrium | 225,000 | 2027 | Under construction |
| P-83 (Búzios 11) | Búzios | Petrobras | EPC | Seatrium | 225,000 | 2027 | Under construction |
Other Seatrium units in Brazil
| FPSO | Field | Field operator | Contract | Contractor / owner | Oil (bpd) | First oil | Status |
|---|---|---|---|---|---|---|---|
| P-78 (Búzios 6) | Búzios | Petrobras | EPC | Seatrium | 180,000 | Dec 2025 | Producing |
| P-82 (Búzios 10) | Búzios | Petrobras | EPC | Seatrium | 225,000 | 2027 | Under construction |
| P-83 (Búzios 11) | Búzios | Petrobras | EPC | Seatrium | 225,000 | 2027 | Under construction |
| P-84 (Atapu 2) | Atapu | Petrobras | EPC | Seatrium | 225,000 | 2029–30 | Under construction |
| P-85 (Sépia 2) | Sépia | Petrobras | EPC | Seatrium | 225,000 | 2029–30 | Under construction |
Selling into Brazil's FPSO market? The Brazil FPSO Market Entry Scan maps which units, integrators and packages fit your product, the local content rules that apply, and who to talk to — in two weeks. Suppliers can also claim a featured profile as a Founding Partner.