FPSO P-78 (Búzios 6)

FPSO P-78 is an EPC-built unit (contractor: Seatrium) on the Búzios field, operated by Petrobras with a nameplate capacity of 180,000 barrels of oil per day. It started production in Dec 2025 and is producing.

Updated October 2026·Public data only

Status
Producing
Field
Búzios
Basin
Santos
Field operator
Petrobras
Contract model
EPC
Contractor / owner
Seatrium
Oil capacity
180,000 bpd
First oil
Dec 2025
Supplier on this unit?Equipment and service suppliers with a track record on FPSO P-78 can be featured here. Become a Founding Partner.

Other units at Búzios

Other FPSOs on the same field
FPSOFieldField operatorContractContractor / ownerOil (bpd)First oilStatus
P-74BúziosPetrobrasOwned (Petrobras)Petrobras150,000Apr 2018Producing
P-75BúziosPetrobrasOwned (Petrobras)Petrobras150,000Nov 2018Producing
P-76BúziosPetrobrasOwned (Petrobras)Petrobras—Feb 2019Producing
P-77BúziosPetrobrasOwned (Petrobras)Petrobras150,0002019Producing
Almirante Barroso (MV32)BúziosPetrobrasCharterMODEC150,000May 2023Producing
Almirante TamandaréBúziosPetrobrasCharterSBM Offshore225,000Feb 2025Producing
P-79 (Búzios 8)BúziosPetrobrasEPCSaipem + Hanwha Ocean180,000May 2026Producing
P-80 (Búzios 9)BúziosPetrobrasEPCSeatrium225,0002027Under construction
P-82 (Búzios 10)BúziosPetrobrasEPCSeatrium225,0002027Under construction
P-83 (Búzios 11)BúziosPetrobrasEPCSeatrium225,0002027Under construction

Other Seatrium units in Brazil

Seatrium fleet in this directory
FPSOFieldField operatorContractContractor / ownerOil (bpd)First oilStatus
P-80 (Búzios 9)BúziosPetrobrasEPCSeatrium225,0002027Under construction
P-82 (Búzios 10)BúziosPetrobrasEPCSeatrium225,0002027Under construction
P-83 (Búzios 11)BúziosPetrobrasEPCSeatrium225,0002027Under construction
P-84 (Atapu 2)AtapuPetrobrasEPCSeatrium225,0002029–30Under construction
P-85 (Sépia 2)SépiaPetrobrasEPCSeatrium225,0002029–30Under construction

Selling into Brazil's FPSO market? The Brazil FPSO Market Entry Scan maps which units, integrators and packages fit your product, the local content rules that apply, and who to talk to — in two weeks. Suppliers can also claim a featured profile as a Founding Partner.

Sources

  1. World Oil — Petrobras first oil at Búzios 6 (P-78)
Pedro Sotomayor

Pedro Sotomayor, PMP® — Senior Cost Engineer on FPSO projects, 15+ years in offshore cost engineering and project controls. Every figure in this directory links to a public source.